Refining Constellation

Refining Constellation’s plans to make 2015 – Hanley proposes major changes

Citing schedule concerns and technical challenges, Constellation manager Jeff Hanley has outlined a series of proposed solutions to avoid further slips in the Ares/Orion schedule. Mr Hanley proposes deleting the Ares I-Y test flight, making Ares I’s first stage disposable, switching from Orion 4 to Orion 3 as the Full Operational Capability (FOC) date, along with a host of additional changes in order to achieve the 2015 target for manned Orion debut. The proposals come at a time where plans are being drawn up for a series of major reviews on the future of the Constellation Program.

This entry was posted in NASA, Space Policy. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>