European Space Agency 30 Days from ATV Resupply Mission

ATV 3
Loading Cargo Aboard ATV 3 – Edoardo Amaldi
Image Credit: ESA / CNES / Arianespace / Optique Video du CSG–S. Martin 2011

The European Space Agency’s Edoardo Amaldi mission to the International Space Station is scheduled for 1000 UTC on 9 March 2012. It is scheduled to dock with the ISS at 0138 UTC on 19 March, and stay attached until the end of August, when it will detach and de-orbit with tons of garbage and burn up in the atmosphere.

This is the third mission by ESA to the ISS and will carry almost six tons of cargo:

  • two tons of dry cargo
  • 285 kg of water
  • more than three tons of propellants

ATV 3
Assembled ATV 3 Spacecraft
Image Credit: ESA / CNES / Arianespace / Optique Video du CSG – J.M. Guillon

This entry was posted in European Space Agency, International Space Station, NASA and tagged , , , , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>